Posted
on 1 December 2015
We are fast approaching the end of 2015. We want to give you as much notice as possible, so that if you need any products from us to complete your renovations over the holidays, you can come in sooner rather than later. Our Clayton office and yard will be closed from midday on Tuesday, the 22nd of December and will re-open on Monday the 4th January 2016. If we don't see you until the New Year, have a safe and happy festive season.
Posted
on 25 November 2015
)
Our HAAS machine, our pride and joy of the fleet, has gone on holidays. Currently working it's way through the South East corridor of Victoria helping out with timber collections at regional transfer stations. This giant machine basically shreds all of the timber waste product that would have gone to landfill, instead turns it to mulch which can get re-purposed.
Posted
on 4 November 2015
)
As part of our waste management plan, we recently installed a weighbridge at our depot. We can now accurately measure all of the waste that goes in and out from demolition sites. Not only does this reduce risks to safety through the prevention of overloading, but also allows us to minimise waste and send more materials like concrete and steel to our recycling partners. This fine piece of machinery is what helps us achieve our 97% recycle rate.